Map dead spots and tested relay locations
Mark what worked and verify both legs of a relay.
Mark only the paths you tested. A check from the west door to net control covers that path under those conditions. A mark for an entire building or neighborhood can hide the difference between a place you checked and one you’ve never tried.
Mark the result and the next action
Use four labels: two-way, one-way, no contact, and untested. Keep the date and setup with the map. For a one-way or no-contact point, find a safe location an operator can reach and wait at. Test from the problem point to the relay, then from the relay to net control, in both directions. Add the relay’s exact operating position and the time it will listen. The repeater went quiet
Transmit
Give a relay one test message with a location and deadline. Have them deliver it to net control and bring the read-back to the sender. If a direction fails, mark it and try a different relay position or the group’s alternate method. Share the revised map with the radio plan and schedule a retest after a change in equipment, location, or season. Printable communications plan